• Deutsch
  • English
Werner Consult
  • Home
  • Company
    • About us
    • Management
    • Company structure
    • Quality
  • Services
  • Competencies
    • Railway design
    • Road design
    • Airport design
    • Structural Engineering
    • Hydraulic engineering
    • Construction Management Civil Eng.
    • Construction Management Building
  • Projects
    • Railway construction
    • Road construction
    • Airport construction
    • Garage construction
    • hydraulic engineering
    • Structural engineering
    • Bridgework engineering
  • News
  • Jobs
  • Portal
  • Contact

Airport construction

Airport Vienna, Restoration Runway 16/34

Project Description:
Full restoration of the runway built in the seventies in order to increase the load-bearing capacity to accommodate the new aeronautical developments.

Client:
Airport Vienna AG
Timeframe: 2011 - 2013          
Construction Term: 2012 - 2013
Runway Length: 3600 m
Project Share WERNER CONSULT: General planning

  • Click to enlarge image fb-vie-piste-16-34-040.jpg
  • Click to enlarge image fb-vie-piste-16-34-100-dsc-8209.jpg
  • Click to enlarge image fb-vie-piste-16-34-200-dsc-8214.jpg
  • Click to enlarge image fb-vie-piste-16-34-300-dsc-8219.jpg
  • Click to enlarge image fb-vie-piste-16-34-320-dsc-8212.jpg
  • Click to enlarge image fb-vie-piste-16-34-330-dsc-8221.jpg
  • Click to enlarge image fb-vie-piste-16-34-360-dsc-8223.jpg
  • Click to enlarge image fb-vie-piste-16-34-380-dsc-8225.jpg
  • Click to enlarge image fb-vie-piste-16-34-400-dsc-8236.jpg
  • Click to enlarge image fb-vie-piste-16-34-430-dsc-8241.jpg
  • Click to enlarge image fb-vie-piste-16-34-460-dsc-8242.jpg
  •  
View the embedded image gallery online at:
http://www.wernerconsult.at/index.php/en/projects/airport-construction.html#sigProIdce828f0b77

Airport Vienna, Apron North-East Expansion, Phase 2

Project Description:
The apron expansion North/East phase 2 had to be implemented in order to optimally integrate the terminal 3 check-in into all apron areas.

Client:
Airport Vienna AG
Timeframe: 2004 - 2011           
Construction Term: 2005 - 2009
Overall Dimension: > 610.000 m²
De-icing Station: > 40.500 m²
Parking Spaces: 191 cars, 23 buses, 3 truck docking stations, aircraft positions: 21
Project Share WERNER CONSULT: General planning, planning coordination pursuant of BauKG (Construction Coordination Act)

  • Click to enlarge image fb-vie-veno2-100-f05.jpg
  • Click to enlarge image fb-vie-veno2-300-p1180855.jpg
  • Click to enlarge image fb-vie-veno2-400-p1180841.jpg
  • Click to enlarge image fb-vie-veno2-600-img-7864.jpg
  • Click to enlarge image fb-vie-veno2-600-img-7871.jpg
  • Click to enlarge image fb-vie-veno2-700-f15-veno2.jpg
  • Click to enlarge image fb-vie-veno2-800-img-0444.jpg
  • Click to enlarge image fb-vie-veno2-900-veno-2c.jpg
  •  
View the embedded image gallery online at:
http://www.wernerconsult.at/index.php/en/projects/airport-construction.html#sigProId6cbc1d45be

Airport Graz, New Construction High-Speed Taxiway C

Project Description:
Construction of a new high-speed taxiway and a new taxiway to access existing aircraft parking areas.

Client:
Airport Graz Betriebs GmbH
Timeframe: 2009 - 2012           
Construction Term: 2012 - ongoing.
Taxiway Dimensions: 13.000 m²
Apron Dimensions:
17.000 m²
Project Share WERNER CONSULT: General planning; tender, project management, planning- and construction site coordination pursuant of BauKG (Construction Coordination Act).

  • Click to enlarge image fb-graz-schnellabrollweg-c-100.jpg
  • Click to enlarge image fb-graz-schnellabrollweg-c-200-01.jpg
  •  
View the embedded image gallery online at:
http://www.wernerconsult.at/index.php/en/projects/airport-construction.html#sigProId311eb2718c

Airfield Hinterstoisser Zeltweg, Military Facility, Expansion Measures Eurofighters

Project Description:
Preparatory measures to accommodate the Austrian Armed Forces Eurofighters

Client:
Heeresbauverwaltung Süd (Armed Forces Planning Department, South)
Timeframe: 2005 - 2010          
Construction Term: 2006 - 2010
Dimension: 310,000 m²
Runway Length:
2,750 m²
Project Share WERNER CONSULT: General planning (incl. tender, proposal assessment)

  • Click to enlarge image fb-zeltweg-100-aw2-2808a.jpg
  •  
View the embedded image gallery online at:
http://www.wernerconsult.at/index.php/en/projects/airport-construction.html#sigProId9e28032f50

Airport Vienna, Drainage Runway 16/34

Project Description:
Renewal of canalization in the runway system 16/34.

Client:
Airport Vienna AG
Timeframe: 2000 - 2008          
Construction Term: 2002 - 2005
Canal: approx. 25.000 lfm (running meters)
Sealed Surface: 400 ha (hectare)
Basins, pump stations etc.
Project Share WERNER CONSULT (in consortium): General planning (variance analysis up to detail planning), tender for the runway system canal project 16/34, static-constructive work on the retention basins, pump stations etc.

  • Click to enlarge image fb-vie-piste-16-34-entw-200-dsc00280.jpg
  • Click to enlarge image fb-vie-piste-16-34-entw-300-dsc00200.jpg
  • Click to enlarge image fb-vie-piste-16-34-entw-500-img_1452.jpg
  •  
View the embedded image gallery online at:
http://www.wernerconsult.at/index.php/en/projects/airport-construction.html#sigProId1354149c98

  1. Airport Vienna, Apron West Phase 1-3
  2. Airport Vienna, New General Aviation Center (GAC) - Apron
  3. Airport Vienna, Taxiway Restoration A1, A2, Taxiway 50, New Construction Taxiway A3
  4. Airport Linz Hörsching, Restoration Runway 09-27
Prev
1234
Next
Werner Consult Ziviltechniker GmbH | Leithastraße 10   1200 Wien Austria | Tel.: +43/1/31360-0 | Fax: +43/1/31360-090 | Diese E-Mail-Adresse ist vor Spambots geschützt! Zur Anzeige muss JavaScript eingeschaltet sein! |
  • Imprint

©2021 WERNER CONSULT